"The secret to creativity is knowing how to hide your
sources."
In the 2nd lecture students shared, what they
learned from the Blogs of Mr. Mandi. I would like to share one which I found
most interesting and was discussed most in the lecture. The name is SKY WALK:
Using cartoon as a training tool for Teamwork.
In this cartoon the challenge for three members is to cross roof top from left side to right side safely, as a skywalk. In all, there are three members. They are given a pole which is strong enough to carry the load of people as given in the cartoon. They have no access to resources other than mentioned in the cartoon. It is cautioned that the roof top gap is so much that any attempts by the group members trying to jump to the other side will lead to FATAL consequences.
— Albert Einstein
After a very unique start in first lecture of POM,
expectedly 2nd and 3rd lectures led to unlearning of
certain misconceptions and then learning of new Ideas of better organisational management.
In this cartoon the challenge for three members is to cross roof top from left side to right side safely, as a skywalk. In all, there are three members. They are given a pole which is strong enough to carry the load of people as given in the cartoon. They have no access to resources other than mentioned in the cartoon. It is cautioned that the roof top gap is so much that any attempts by the group members trying to jump to the other side will lead to FATAL consequences.
There are two key issues in the cartoon.
a.
Length of the 'Walk able Gap'
b.
Minimum Number of people needed for safe crossover
It took 9 steps to complete this task and during these 9
steps we got to learn various concepts of management, which are:
Team - High performance teams - Self managed teams -
Leadership in team - Team formation stages - Team norms - Cohesiveness -
Independent tasks - Interdependent tasks - Outcome interdependence - Team
members' roles - Competition and Cooperation - Authority in teamwork situations
- Participative management- Flat team
The steps and position of 3 persons while crossing:
Persons
|
Front Person |
Middle Person |
Rear person |
Steps ( 1 to
9)
|
|||
1
|
Safe
|
Safe
|
Safe
|
2
|
Half Risky,
|
Safe
|
Safe
|
3
|
Full Risky,
|
Safe
|
Safe
|
4
|
Half Risky,
|
Half Risky,
|
Safe
|
5
|
Safe
|
Full Risky,
|
Safe
|
6
|
Safe
|
Half Risky,
|
Half Risky,
|
7
|
Safe
|
Safe
|
Full Risky,
|
8
|
Safe
|
Safe
|
Half Risky,
|
9
|
Safe
|
Safe
|
Safe
|
In the 3rd and most interesting lecture so far,
Prof. Mandi employed a unique way of teaching the difference between Craft
Management and Modern Management. This also led to clearing of many
misconceptions we had about Modern Management.
We were provided with cubical blocks and our first task was to estimate how high the single block pillar can go in case of two different approaches:
We were provided with cubical blocks and our first task was to estimate how high the single block pillar can go in case of two different approaches:
1.
Person A :- OPEN EYED
2.
Person B :- BLIND FOLDED
As expected majority went with open eyed, saying he can
build a higher block.
Next step was to perform these to operations and see what
actual result is. For Person A highest bid went to 25 where as for Person B it
went only up to 18.
A volunteer started making the pillar using both his eyes
open and hands but was only able to make the pillar 22 blocks high.
For blind for task was more complicated. Team of 3 people
was chosen, one was made CEO (Chief Executive Officer), One Manager to instruct
the third blind folded worker. The positions were decided by the 3 consulting
each other.
He worker started building the tower while manager was
instructing him where to place the block. Their start was very shacky but
slowly and slowly to our amusement, they went on to build a tower of 25 blocks.
While all this was going on we were observing a situation
somewhat similar to a real life working condition that is how much an effective
communication is necessary between a worker and manager. We also noticed that
an open eyed person was more cautious and predictable in his approach, whereas
there was no fear for blind folded. He was just doing as instructed by his
manager.
Most important thing that worker wanted while doing his task
was motivation and appreciation.
It was a great learning exercise, by the performance of one
very interesting and unpredictable task.
Person A showed the technique of Craft management whereas
Person B showed the technique of modern management
The comparison between Craft/Traditional Management and
Modern Management is as follows :
Parameter
|
CRAFT Management
|
Modern Management
|
Work
|
Complete
work is done by a single person. Work will be very ambiguous.
|
Work is
shared between two or more individuals, and thus taking the pressure off from
one person. It will be distributed. Work will be crystal clear.
|
Satisfaction
|
Higher
|
Less
|
Decision
|
The
person who is working (open eyed) takes his own decision so he will be under
pressure, his efficiency decreases.
|
Manager
takes all the decision the, employees (blind folded) will not be under
excessive pressure thus increasing the efficiency.
|
Skill
|
Since
the person is doing all the work himself, his skill will be more.
|
Since
the work is divided into many parts skills of the each employee is limited.
Quality will be lower.
|
Productivity
|
Productivity
is low.
|
Productivity
is high.
|
Another important point learned during this learning session
was of removing the middle management in organisational system and keeping a
more streamlined higher management and grass root employees. Try to keep them
blind folded so that they don’t develop higher and variety of skills. This will
lead to higher production and better control.
One more important learning was about how the work further dissected